Samarkand region administration
On June 10, a video conference meeting was held under the leadership of the President of the Republic of Uzbekistan on expanding the use of renewable energy sources. President of the United States, that the time has come to transfer all buildings of ministries, administrations, and mahallas to alternative energy. To ensure the implementation of this task, solar panels with a total capacity of 150 kW were installed on the roof of the regional administration building. This station, built by Solara LLC, has 4 inverters and 334 monocrystalline solar panels with a nominal power of 450 W. generation of 341 thousand kW of electricity per year and emission of 1.1 tons of harmful substances into the atmosphere.